Minimizing Rental Costs in Flowshop Scheduling with the NEH (Nawaz, Enscor, and Ham) Method

Authors

  • Muhammad Faudzi Universitas Muhammadiyah Kudus, Indonesia
  • M Adib Jauhari Dwi Putra Universitas Muhammadiyah Kudus, Indonesia

DOI:

https://doi.org/10.53017/ujas.101

Keywords:

Flowshop Scheduling, Minimization of Rent Costs, NEH Method

Abstract

This study discusses how to minimize rental costs in flowshop scheduling. Optimal scheduling time was obtained using the Nawaz, Enscor, and Ham (NEH) method. The right time to rent a machine is obtained by comparing the utility of the machine with the processing time of each machine with the processing time of each job on the machine. We apply this research in CV. SAMHARI which is a company that manufactures sandals. After applying the rental cost minimization method at the research site, we found that CV. SAMHARI can minimize the rental costs incurred by Rp. 273700.

Downloads

Download data is not yet available.

References

L. Narain, “Optimize Renting Times of Machines in Flow-Shop Scheduling,” no. 5, pp. 84–88, 2015.

L. Narain, “Minimizingtotal Rental Costin Scheduling Problems,” vol. 6, no. June, pp. 280–289, 2015.

M. F. Bahari, S. Sudrajat, and E. Lesmana, “Minimize Rental Costs on Flowshop Scheduling,” J. Ilm. Sains, vol. 20, no. 2, p. 58, 2020, doi: 10.35799/jis.20.2.2020.27765.

M. F. Bahari, “Minimisasi Biaya Sewa Pada Penjadwalan Flow Shop 3 Mesin dengan Menggunakan Metode Nawaz, Enscor, and Ham (NEH),” Kubik J. Publ. Ilm. Mat., vol. 4, no. 2, pp. 196–201, 2020, doi: 10.15575/kubik.v4i2.6557.

D. Gupta and P. Sehgal, “Unavailability in n × 2 Flow Shop Scheduling To Minimize Rental Cost with Job Block Criteria,” vol. 5, no. 9, pp. 6975–6981, 2018.

D. Gupta and R. Goel, “Minimizing Hiring Cost of the Machine Under No Idle Constraints in N*2 Flow Shop Scheduling with Transportation and Set Up Time.,” Int. J. Innov. Technol. Explor. Eng., vol. 9, no. 2, pp. 5227–5229, 2019, doi: 10.35940/ijitee.b7565.129219.

D. Gupta and P. Sehgal, “Unavailability of the machines in two stage flow shop scheduling model to minimize rental cost with job block criteria and transportation time,” Adv. Math. Sci. J., vol. 9, no. 9, pp. 6789–6798, 2020, doi: 10.37418/amsj.9.9.37.

S. Sharma, D. Gupta, P. Singla, and S. Bala, “Minimizing Rental Cost for n-Jobs , 2-Machines Flow Shop Scheduling , Processing Time Associated with Probabilities Including Transportation Time and Job Block criteria,” vol. 1, no. 3, pp. 17–28, 2011.

Q. S. Ahmad, M. H. Khan, S. Unit, and S. Arabia, “n-Jobs And M-Machines Flowshop Scheduling To Minimize The Rental,” vol. 42, no. 42, pp. 88–90, 2017.

I. M. Al-Harkan, “Algorithms for Sequencing and Scheduling,” merging Seq. Sched. theory with Genet. algorithms to solve Stoch. job shops, p. 438, 1997.

Downloads

Published

2021-12-09

How to Cite

Faudzi, M., & Putra, M. A. J. D. (2021). Minimizing Rental Costs in Flowshop Scheduling with the NEH (Nawaz, Enscor, and Ham) Method. Urecol Journal. Part D: Applied Sciences, 1(2), 88–94. https://doi.org/10.53017/ujas.101

Issue

Section

Articles